Response in 1–2 business days. NDA-friendly
Test pass rate ↑
Retest cycles ↓
Time-to-acceptance ↓
Defects / NCRs ↓
Availability / MTBF ↑
$ saved / payback ↓
Requirements + traceability discipline (RTM/decision log)
Risk + verification strategy (FMEA, V&V plan, delivery gates)
Technical reviews, supplier oversight, and weekly leadership cadence
Review of test plan, procedures, hazards, and acceptance criteria
Instrumentation + data-quality check (what you’ll trust / what you won’t)
TRR pack: findings, action list, and go/no-go readiness memo
RTM + V&V plan aligned to requirements
Evidence matrix + procedure list + gap closure plan
Compliance-ready packaging + document control structure
Systems Engineering Lead — Requirements, interfaces, risks, verification backbone for complex hardware projects (6–12 weeks)
Rapid Integration & Validation — Subsystem integration with ICDs, V&V execution, evidence pack (4–8 weeks)
Reliability & Energy Audit — Performance baseline + ROI-ranked fixes for plants/utilities (2–4 weeks)
Test & Measurement Campaign — Instrumentation strategy, data collection, performance analysis (1–3 weeks)
Drone Inspection + Engineering Report — RPAS aerial inspection with defect mapping and risk-ranked recommendations (3–5 days)
Requirements set + RTM
ICDs / interface ownership
Risk register + change control
TRR facilitation + readiness memo
Instrumentation + data quality review
Test procedure gaps + action list
V&V plan + verification strategy
Evidence matrix + procedure list
Compliance-ready packaging / doc control
Integration plan + bring-up checklist
Interface actions + NCR support
Validation checks + evidence pack
FMEA/FMECA workshop + mitigations
RCFA hypothesis tree + containment
Corrective action plan + validation plan
Delivery gating + technical reviews
Supplier audits / coordination
Decision log + executive updates
Fractional Chief Engineer Pack: decision log, priority roadmap, weekly engineering cadence, exec update—so leadership decisions stay defensible and delivery stays unblocked.
TRR (Test Readiness) Pack: TRR checklist, procedure review, instrumentation/data-quality check, hazards + acceptance gates, readiness memo + action list—so you don’t waste a test window.
V&V Documentation Pack: RTM, V&V plan, verification procedure list, evidence matrix, compliance memo, doc-control structure—so acceptance/audit is clean and fast.
Interface Control Pack: ICD(s), interface action list, ownership/RACI, change-control rules—so integration doesn’t drift.
FMEA/FMECA Pack: top failure modes, severity/occurrence/detection rationale, ranked mitigations with owners/dates—so risk turns into actions.
RCFA Pack (Emergency): hypothesis tree, containment actions, likely root cause(s), corrective action plan + validation plan—so operations stabilize quickly.
Test & Measurement Pack: instrumentation plan + channel list, test procedure, plots + conclusions—so data drives the next decision.
P.Eng. (Canada) • NDA-friendly • Insured • Remote or on-site • Based in Victoria, BC
Licensed Professional Engineer (Canada)
Systems engineering + V&V (requirements, ICDs, traceability, acceptance gates)
Test planning + execution support (procedures, instrumentation, data quality, reporting)
Risk + reliability (FMEA/FMECA, root cause, CAPA, corrective action validation)
Delivery support (supplier coordination, change control, readiness reviews)
Led or supported test campaigns (planning → procedure → data → report) in regulated environments
Built audit-ready V&V packs (RTM, evidence matrices, compliance memos) under tight timelines
Delivered root cause + corrective actions to stabilize operations and prevent repeats
Align: scope, constraints, KPIs, acceptance criteria
Plan: verification strategy + schedule + risk controls
Execute: integration/testing, analysis, documentation
Prove: report, evidence pack, sign-off + next steps
Weekly cadence. Remote-first; on-site as needed.
Certification readiness: RTM + V&V plan + evidence pack aligned to acceptance criteria
Pre-test gating (TRR): procedures, hazards, instrumentation, pass/fail gates—before you burn a test window
Integration & bring-up: ICDs, interface closure, checklists, NCR disposition support
Environmental/functional testing support: planning → execution support → data → report
Supplier deliverables review: SOWs, test reports, compliance evidence, readiness memos
Acceptance & supplier audit support: deliverable review, compliance evidence, sign-off packaging
Retrofit integration: interface control + acceptance gates for new subsystems on existing platforms
Failure response: rapid RCFA to stabilize operations and prevent repeats
Reliability improvements: chronic failures, downtime drivers, corrective actions + validation plan
Hard-to-reach inspections: structured inspection plan, findings, and prioritized next steps
Vendor coordination: technical reviews, change control, acceptance documentation
Port/terminal assets: reliability issues, retrofit integration, acceptance documentation
Uptime & throughput: bottleneck identification, repeat-failure reduction, corrective actions + validation
Test & measurement: instrumentation plan + channel list, test procedure, decision-ready plots/report
Audit-ready documentation: procedures, evidence matrices, sign-off packages for acceptance
Risk reduction: FMEA/FMECA with ranked mitigations, owners, and timelines
Fieldwork + analysis: structured data capture, root cause direction, ROI-ranked fixes
Automation & production equipment: RCFA/CAPA, repeat-failure reduction, test & measurement for process control
Not sure where you fit? Describe your situation and I’ll recommend the best entry offer (Fractional / TRR / V&V Sprint).
Based in Victoria, BC. Remote-first, with on-site work available by arrangement across BC and Canada.
Hardware and industrial teams—startups through established organizations—who need help with integration, test readiness, verification evidence, reliability, or failure recovery.
Send a short description of the problem, what “done” looks like, and any deadlines. I’ll propose a scope, timeline, and price range within 1–2 business days.
Both. Most engagements are fixed-scope/fixed-fee (preferred). For uncertain scope, we use a capped day-rate with written checkpoints.
TRR Sprint: from $3.5k
V&V Documentation Sprint: from $6.5k
Fractional Chief Engineer: from $2.8k/month (monthly minimum)
Larger integration work typically starts at $18k+ (scope-dependent)
Projects: 50% to reserve, 25% mid-point, 25% on delivery (Net 15).
Retainers: prepaid monthly.
TRR Sprint: 5–10 business days
V&V Documentation Sprint: 10–20 business days (depends on inputs)
Fractional support: 30-day minimum, typically 3–6 months
Integration work: often 4–8 weeks depending on maturity and access
Material scope changes are quoted as add-ons or billed at $200–$240/hr, only with written approval.
You own deliverables produced under the SOW. Joa Aero Engineering retains pre-existing methods, templates, and know-how (background IP). NDAs are welcome.
P.Eng. stamping is available where applicable and permitted under the relevant provincial regulations and scope of practice.
Yes. EHS-compliant. WorkSafeBC registered. Commercial General Liability + Professional Liability. COI available on request.
Case-by-case. The client confirms classification and provides required authorizations/permits. I’ll confirm constraints up front before starting.
Yes—Transport Canada–compliant UAV operations, with engineering-style findings (defect map, risk ranking, and prioritized next actions).
Access to the current specs/requirements (even if messy), test plans/procedures (if applicable), stakeholders for quick interviews, and clarity on acceptance criteria or decision points.
One of these outcomes:
- test window is protected (TRR issues closed before execution)
- acceptance is defensible (V&V evidence pack is complete and traceable)
- repeat failures stop (root cause + corrective actions validated)
- delivery is controlled (interfaces owned, risks tracked, decisions documented)
Business-hours response within 24 hours. Optional on-call add-on available (4-hour blocks; faster response by arrangement).
If cancelled ≥10 business days before start: full deposit refund.
If cancelled <10 business days: 25% scheduling fee.
In-progress work: billed for actuals plus 15% (admin/transition).
Joa Aero Engineering
Precision. Creativity. Integrity.
Part of the Casagou Group
Explore our other services:
Casagou Ops — Business Systems & Automation
Eventia Media — Event Video Production
Drone Victoria — Aerial Photography
BC Funeral Videos — Memorial Livestreams
© 2026 Joa Aero Engineering. All rights reserved.